Назад
The ATOM Cement plant with the annual capacity of 550 thousand tons was inaugurated near Ekaterinburg.
16.08.2021

The Atomstroycomplex, the main developer in the Urals, launched the ATOM Cement plant on 12 August. The plant with the rated capacity of 550 thousand tons of cement has already started supplying its first products in the first half of 2021; Atomstroycomplex announced in late July that it had already started building with cement of its own production.

The capacity of the enterprise commissioned near the town of Sysert in the Sverdlovsk Oblast will be enough to ensure the construction of 2.7 million square meters of housing. This was stated by the representatives of the company at the commissioning ceremony with the participation of the Governor of the region Evgeny Kuivashev.

ATOM Cement” factory is located on a territory of 8 hectares and employs 330 people. Investments in the project amounted to about 4.5 billion rubles. The production line is based on a 170 m long and 4.5 m diameter clinker rotary kiln. Grinding is carried out by two cement mills.

The company has a certificate for cement CEM l 42.5H (old – GOST 10178, corresponding to the compressive strength class M500), the procedure of certification of cement CEM l 52.5H (old – GOST 10178, corresponding to the compressive strength class M600) is underway.

70% of production of “ATOM Cement” is planned to send in free sale, now the shipment is made by cement wagons, it is planned to start shipment in big bags.

“Construction of our own cement plant was an important strategic step for us to develop a closed cycle of production, which allows us to fully control the quality – after the commissioning of the facility we are responsible for it. ATOM Cement’s products are characterized by high stability, which is extremely important for the regular consumer,” says Atomstroycomplex General Director, Honored Builder of Russia Valery Ananiev.

If you have found a spelling error, please, notify us by selecting that text and pressing Ctrl+Enter.