THE SOLUTION TO THE PROBLEM OF CONCRETE MIXTURES PRODUCTION IN WINTERTIME
CONCRETE
UDC 666.9.031
Филатов Е. Ф. Начальник строительной лаборатории, ООО «ИНТ-Солюшн», Брянск, Россия
Alitinform №1 (58) 2020 г. 38-41 p.
Abstract
The article describes the technologies of heating inert materials during the preparation of concrete mixtures in the winter period. The use of various types of hot air generators and boiler equipment for water heating can play a significant role.
Key words:
concrete mixture, generator, boiler, heating of inert materials, compressor, insulation