Назад
THE SOLUTION TO THE PROBLEM OF CONCRETE MIXTURES PRODUCTION IN WINTERTIME

CONCRETE

UDC 666.9.031

Filatov, E. F. head of the construction laboratory, Nadezhda UCC, Bryansk, Russia

Alitinform №1 (58) 2020 г. 38-41 p.

Abstract

The article describes the technologies of heating inert materials during the preparation of concrete mixtures in the winter period. The use of various types of hot air generators and boiler equipment for water heating can play a significant role.

Key words:

concrete mixture, generator, boiler, heating of inert materials, compressor, insulation

Read more in the magazine

To do this you need to subscribe to one of the options and can read all the articles without limitation and in any format that is convenient for you.

Subscribe

Download short magazine